Hello! Welcome to Gongyi Hongsheng Pipeline Equipment Co., Ltd. official website.

Popular searches:

Compensator _ bellows _ compensator _ non-metallic compensator _ rubber compensator _ telescopic _ waterproof casing _ rubber joint _ expansion joint _ skin _ professional custom manufacturers

 

About Us

巩义市邦盛管道设备有限公司
联系人:贺经理
手机:13523555121
联系人:王经理
手机:13803838882
电话:0371-64031876
传真:0371-69580678
邮箱:13523555121@163.com
邮编:451200
地址:河南巩义市西村镇工业园区

News

You are here:Home > News

JZW Type Axial External Pressure Corrugation Compensator

Time:2019-7-27 Click:1039time

Axial external pressure corrugated compensator mainly absorbs axial displacement. It has the advantages of large compensation, good thermal insulation performance and removal of residual media. The internal pressure type is the medium in the compensator, the external pressure type is the medium outside the compensator, the internal pressure type is based on the thermal expansion of the compressed corrugated absorption pipeline, the external pressure type is based on the thermal expansion of the stretched corrugated absorption pipeline, according to the specification, the internal pressure type needs to pre-stretch according to the environmental temperature before installation, and the external pressure type needs to pre-stretch according to the environmental temperature before installation. Pre-compression is required. Installation and use requirements of compensators: 1. The compensator needs to check its model, specification and pipeline configuration before installation, and must meet the design requirements. 2. For the corrugated compensator with inner sleeve, attention should be paid to make the direction of inner sleeve consistent with the direction of medium flow. The hinge rotation plane of the hinged corrugated compensator should be consistent with the displacement rotation plane. 3. A "cold-tight" compensator is needed. The auxiliary components used for pre-deformation should be removed after the installation of the pipeline. 4. It is strictly forbidden to use the method of deformation of corrugated compensator to adjust the OVER-TOLERANCE of pipeline installation, so as to avoid affecting the normal function of corrugated compensator, reduce its service life and increase the load of piping system, equipment and supporting components. 5. During installation, no welding slag is allowed to splash onto the surface of the wave shell, and no other mechanical damage is allowed to the wave shell. After installation of piping system, yellow auxiliary positioning components and fasteners used for installation and transportation on corrugated compensator should be removed as soon as possible, and the limit device should be adjusted to the prescribed position according to the design requirements, so that the piping system has sufficient compensation capacity under environmental conditions. 6. All active components of the compensator shall not be stuck by external components or limit their range of activity, and the normal operation of each active part shall be guaranteed. In hydraulic test, the secondary fixture at the end of the pipeline with compensator should be strengthened so that the pipeline does not move or rotate. For compensators and connecting pipes used in gas media, attention should be paid to whether temporary brackets should be added when filling water. The 96 chloride ion content of the water cleaning solution for hydraulic test is not more than 25PPM. After hydraulic test, the accumulated water in the corrugated shell should be discharged as soon as possible, and the inner surface of the corrugated shell should be dried quickly. The insulation material contacted with the compensator bellows should not contain chloride ion. Pressure level: 0.1 Mpa-2.5 Mpa Axial Compensation of 18mm-400mm Design Temperature: - 20 -+400 degrees Celsius Over the past few years, our Gongyi Hongsheng Pipeline Equipment Co., Ltd. has continuously developed new products, improved product quality, done a lot of research and experiments, put forward a new product structure, greatly improved the performance of the products, and won the praise of the vast number of users. If special specifications of products are needed, they can be designed and manufactured according to user's requirements. And sincerely hope that new and old customers, design units recommend the use of our company's products.

Products Navigation
豫ICP备10022100号 Copyright: Gongyi City Bangsheng Pipeline Equipment Co., Ltd. Address: Industrial Park, Xicun Town, Gongyi City, Henan Province

Tel: 0371-64031876 Mobile: 13523555121 Fax: 0371-657080678

Technical Support:Hangzhou Sixi You are73757Visitors